Project

Village Water Supply Systems
(VWSS)

Client

TRUST CARTEL CONTINUITY Consulting Engineers

Studies and follow-up control of the works of realization of two (02) village water supply systems (VWSS) in the municipality of POBE, the department of PLATEAU

Position: Independent Consultant / Hydraulic Engineer
Location:
Benin
Year:
October 2017.

Activities:
  • Coordination, supervision and control of topographic and hydraulic studies;
  • Detailed design studies;
  • Preparation of tender documents.

Contact us for more information

about our work

Scroll to Top

Fatal error: Uncaught wfWAFStorageFileException: Unable to verify temporary file contents for atomic writing. in /home/dxarmtoc/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:51 Stack trace: #0 /home/dxarmtoc/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(658): wfWAFStorageFile::atomicFilePutContents('/home/dxarmtoc/...', '<?php exit('Acc...') #1 [internal function]: wfWAFStorageFile->saveConfig('livewaf') #2 {main} thrown in /home/dxarmtoc/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 51